Bio ethanol Production from the Landfill Organic Waste Fraction
Energy and Resource Efficiency
Bio stabilization of Jatropha Curcas cake to bio fertilizers through vermicomposting
Waste Management
Feasibility of treating brewery wastewater using bio films
Technology Management
Improve an Emergency Medical System Capacity with Theory of Constraints
Service Systems and Service Management
Reduce Supply Chain Inventory at the Retailer Echelon: A Case Study
Inventory Management
A Comparison of Ambulance Location Models in Two Mexican Cases
Service Systems and Service Management
A Multiple Criteria Approach for Defining the Ambulance System Structure: A Case Study
Service Systems and Service Management
Analysis of Development Policies in Occupational Health and Safety Management System: A System Dynamics Approach
Simulation and PLM Competition
Implementation of six sigma in the construction projects : A Case Study of the Amman Building Construction.
Quality Engineering, Control and Management
Developing a Knowledge-Based Lean Six Sigma Model to Increase the Effectiveness of Healthcare Organisational Resources Management
Energy and Resource Efficiency
A new perspective for Ranking under a DEA cross-evaluation setting
Energy and Resource Efficiency
An economic assessment of South African electricity supply systems
Engineering Economy, Education & Management
A comparative analysis of the potential South African renewable energy sources using Analytical Hierachy Process
Energy and Resource Efficiency
An environmental impact of power supply systems: a comparative analysis Case study of the South African electricity sector
Energy and Resource Efficiency
A sustainability analysis of the South African power supply systems by means of the weighted sum method
Energy and Resource Efficiency
An environmental assessment of energy sector: a critical review
Energy and Resource Efficiency
Improvement of superficial hardness of S355JR steel by superficial plastic deformation
Quality Engineering, Control and Management
TOWARDS INCREASING THE USE OF PRE FABRICATION COMPONENTS AND STAKEHOLDERS INTEGRATION IN MALAYSIA CONSTRUCTION INDUSTRY
Project Management
The Integration of Marketing and Production Areas and its Impact on Organizations
Business Management
Identification and Ranking of Innovation Management Factors in Petrochemical Companies Producing Polyethylene Products
Business Management
Implementation of Lean Manufacturing System to Eliminate Wastes on The Production Process of Line Assembling Electronic Car Components with WRM and VSM Method
Lean and Six Sigma
Deep Groundwater Potential and Chemical Analysis Based on Well Logging Analysis at Kapuk-Cengkareng, West Jakarta, DKI Jakarta, Indonesia
Undergraduate Student Paper Competition
Derive Poker Winning Probability by Statistical JAVA Simulation
High School and Middle School STEM Competition
The role of information sharing on supply chain
Sustainable Operations and Supply Chain Management
Design of a mobile reciprocating pumping system for platinum mines (…pneumatically powered) (CASE FOR ZIMBABWE).
Product Design and Development