An algorithm model for solving the single-period inventory transportation problems with deterministic demand in construction industry

Mohd Kamarul Irwan Abdul Rahim
Publisher: IEOM Society International
0 Paper Citations
1 Views
1 Downloads
Track: Operations Management and Operations Research
Abstract

This paper considers the problem of managing inventory and routing problems in a two-stage supply chain system under a Vendor Managed Inventory (VMI) policy. VMI policy is an integrating decisions between a supplier and the customers in which the supplier assumes the responsibility of maintaining the inventory at the customers while ensuring that they will not run out of stock. The delivery times to the customers are no longer agreed in response to customers' orders; instead the supplier indicates when each delivery takes place. Under the VMI policy, the planning is proactive as it is based on the available information rather than reactive to retailers' orders. Thus, in this research, we assumed that the demand at each customer is stationary and the warehouse is implementing a VMI. The focus of this research is to optimize the inventory and the transportation costs of the customers for a two-stage supply chain system in construction industry. The problem is to identify the delivery quantities, delivery times and routes to the customers for the single-period deterministic inventory routing problem (SP-DIRP) system in construction sector. As a result, a linear mixed-integer program is established for the solutions of the SP-DIRP problem. Some sample tests have indicated that the integrated approach for the SP-DIRP problem provides good result.

Published in: 2nd European International Conference on Industrial Engineering and Operations Management, Paris, France

Publisher: IEOM Society International
Date of Conference: July 26-27, 2018

ISBN: 978-1-5323-5945-3
ISSN/E-ISSN: 2169-8767