3rd Australian Conference on Industrial Engineering and Operations Management

Takt Time Reduction of Genset Assembly Line Using Process Optimization and Lean Manufacturing Tools

Kuldeep Agarwal & Ninad Joshi
Publisher: IEOM Society International
0 Paper Citations
1 Views
Abstract

With rapid developments in the field of AI and data centers, there is a soaring demand for backup power and due to this, genset manufacturers are compelled to increase their throughput and reduce lead times. This study focuses on incorporating process optimization and lean tools for lowering the overall takt time by reducing the cycle time of the generator assembly process at a genset manufacturing company. The eventual goal is to increase the throughput from 6 generators per day to 7 per day. The paper follows a step-by-step methodology starting from the problem statement and uses statistical analysis to monitor the data. The value chain is identified using the current state value stream map and the standard operating procedures (SOPs). The bottlenecks are singled out and a process improvement action plan is created. The process is monitored again after the changes are made in the assembly process and the results are recorded. A total reduction in process time of 30 minutes is achieved from Cells 2 and 3.

Published in: 3rd Australian Conference on Industrial Engineering and Operations Management, Sydney, Australia

Publisher: IEOM Society International
Date of Conference: September 24-26, 2024

ISBN: 979-8-3507-1738-9
ISSN/E-ISSN: 2169-8767