Track: Construction Management
Abstract
The information was gathered through a questionnaire distributed to South African-based construction professionals. Ninety-one (91) questionnaires were obtained from one hundred and twenty (120) questionnaires sent out, with a response rate of 76 percent. Research findings were analyzed in the form of the Kruskal-Wallis test using a descriptive and non-parametric test. The findings showed little relevance. This study's results draw a conclusion to cooperation and compromise as prevalent approaches to conflict management in construction projects.The research recommends adopting collaboration and compromising as a conflict resolving approaches