Analysis of Earned Value and Project Crashing Methods on High Rise Building Project Scheduling (Case Study: Sky House BSD+ Apartment Project)

106 views 10 Downloads
NF
Nicolas Ferreira Universidad del Cono Sur de las Americas
MS
Matias Sanchez Universidad Politécnica y Artística del Paraguay
Download PDF

Published in 2nd Indian International Conference on Industrial Engineering and Operations Management, Warangal, India
Publisher IEOM Society International
Date of Conferences August 16–18, 2022
DOI 10.46254/IN02.20220516
ISBN 978-1-7923-9160-6
ISSN/E-ISSN 2169-8767