Implementation of Overall Equipment Effectiveness (OEE) to Minimze Six Big Losses in Machining Process: A Case Study

223 views 11 Downloads
AS
Anthony Moises Susano-Reyes Universidad de Lima
MT
Miriam Edith Tiburcio-Aquino Universidad de Lima
Download PDF

Published in 3rd Australian Conference on Industrial Engineering and Operations Management, Sydney, Australia
Publisher IEOM Society International
Date of Conferences September 24–26, 2024
DOI 10.46254/AU03.20240065
ISBN 979-8-3507-1738-9
ISSN/E-ISSN 2169-8767