Title: The Move It Forward Theory (MIFT) offers a better method to manage major machine failure in a serial flow line.

Sankar Sengupta, William Edwards & Michael Latcha
Publisher: IEOM Society International
0 Paper Citations
1 Views
1 Downloads
Track: Industry Best Practices
Abstract

The paper presents the research findings on a problem that may help the decision makers to manage a major breakdown in the Trim, Chasis and Final (TCF) area in an automotive assembly plant with lower loss of production. We propose the name of the operating procedure as MIFT (Move It Forward Theory). The proposed method recommends keeping the line moving both upstream and downstream of the failed machine while the failed machine is under repair. The current practice is to stop the line completely until the failed machine is repaired. The entire system resumes operation simultaneously following the repair. 

The research findings are based on study of a scaled down abstraction of the TCF area. The results show that use of MIFT based operating procedure leads to recovery from a major machine failure with lower loss of production compared to the current practice. The results also show that improvement in performance under MIFT procedure depends significantly on the location of the failed machine in relation to the pay point and capacity of the buffers.  The paper includes rationale for success of MIFT as well as future extensions.     

Published in: 3rd European International Conference on Industrial Engineering and Operations Management, Pilsen, Czech Republic

Publisher: IEOM Society International
Date of Conference: July 23-26, 2019

ISBN: 978-1-5323-5949-1
ISSN/E-ISSN: 2169-8767