Track: Undergraduate Student Paper Competition
Abstract
In this project we visited PLASCO factory for Plastic Industries, located in Riyadh. The visit’s purpose was to observe the PVC pipes and pipe fittings machines production process, then analyze the profit and the cost of each of the two machines, and all the constraints to formulate a cash flow analysis in order to compare between both machines to decide which one is more profitable.