This paper proposes the Phased Validation and Rollout Framework (PVRF), a phased validation and rollout framework for scaling autonomous robotic systems from a single validated deployment site to a multi-site production network. Multi-site robotic deployment presents qualitatively different challenges from single-site implementation: configuration variability across sites, non-linear incident amplification at scale, and rollback complexity that increases with network size. Existing frameworks from software engineering and manufacturing systems literature do not fully address these challenges in the context of physical-digital robotic systems. The proposed framework organizes the scale-up process into four phases — single-site validation, limited expansion validation, network release, and operational steady state — each with defined scope, success criteria, key risks, and explicit transition conditions. The framework is validated through application to a 26-site deployment of an automated warehouse robotic platform, achieving a 75% reduction in network-wide push-through incidents and zero network-wide outages during the rollout period. A key finding is that the phase transition decision is the highest-leverage management decision in the rollout process.
Keywords
multi-site deployment, phased rollout, warehouse robotics, validation framework, supply chain.