Continuous Improvement

Downtime Analysis of a Mayo Bottling Line during the Ramp-Up Period: A Case Study

39 views 1 Downloads
DJ
Dima Jawad Ontario Tech University
PE
Peter ElKhoury Ontario Tech University
Download PDF

Published in 14th Annual International Conference on Industrial Engineering and Operations Management, Dubai, UAE
Publisher IEOM Society International
Date of Conferences February 12–14, 2024
DOI 10.46254/AN14.20240132
ISBN 979-8-3507-1734-1
ISSN/E-ISSN 2169-8767