Analysis of Schedule Overrun Methods in Acceleration of Scheduling in the Ploso Bridge Construction Project

65 views 5 Downloads
BU
BINUS University BINUS University
YP
Yosef Dedy Pradipto BINUS University
PA
Putri Arumsari BINUS University
JL
Jose Leonardo Lie BINUS University
Download PDF

Published in 2nd Indian International Conference on Industrial Engineering and Operations Management, Warangal, India
Publisher IEOM Society International
Date of Conferences August 16–18, 2022
DOI 10.46254/IN02.20220514
ISBN 978-1-7923-9160-6
ISSN/E-ISSN 2169-8767