Operations Research

Optimization of the Cost and Duration in the Tower Crane Installation Using Goal Programming (GP) Model

74 views 5 Downloads
NA
Neil Awit Lyceum of the Philippines University
JD
JOEL DE GOMA MAPUA UNIVERSITY
Download PDF

Published in 5th European International Conference on Industrial Engineering and Operations Management, Rome, Italy
Publisher IEOM Society International
Date of Conferences July 26–28, 2022
DOI 10.46254/EU05.20220095
ISBN 978-1-7923-9161-3
ISSN/E-ISSN 2169-8767