In this paper, a new approach on multi-manned assembly line balancing problem is presented. The goal of proposed approach is to establish balance of multi-manned assembly line with minimum number of worker, workstation and resources. For this purpose, mathematical model is developed for the problem. Finally, this model is solved for a numerical example using Gurobi to indicate the applicability of the proposed mathematical model.
Track: Production Planning and Management
Published in: 7th Annual International Conference on Industrial Engineering and Operations Management, Rabat, Morocco
Publisher: IEOM Society International
Date of Conference: April 11
-13
, 2017
ISBN: 978-0-9855497-6-3
ISSN/E-ISSN: 2169-8767