In this research a developed TPM (Ladder) model is presented, this model activates both Safety Health environment (SHE) and Training pillars through the rest six pillars. The developed model is directed to Small Medium Size Enterprises (SME)s as these enterprises suffer from poor management and lack of training. Throughout this model the other six remaining TPM pillar are embraced between training and SHE pillars and overlapped [Planned Maintenance (PM), Autonomous Maintenance (AM), 5S, Quality Maintenance (QM), Office TPM, and KAIZEN]. This overlapping is where some conjugated activities for these six pillars are shared, merged, and counter parted. Therefore, all TPM pillars are integrated horizontally, vertically, and in-between reducing cost, time, and human resources towards lean goal.
Track: Reliability and Maintenance
Published in: 7th Annual International Conference on Industrial Engineering and Operations Management, Rabat, Morocco
Publisher: IEOM Society International
Date of Conference: April 11
-13
, 2017
ISBN: 978-0-9855497-6-3
ISSN/E-ISSN: 2169-8767