Project Management

Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Civil and Structural Works of Coal-Fired Steam Power Plant Construction Project in Indonesia to Improve Time Performance

72 views 18 Downloads
VA
Veriza Agistin Universitas Indonesia
Download PDF

Published in 1st Asia Pacific International Conference on Industrial Engineering and Operations Management, Harbin, China
Publisher IEOM Society International
Date of Conferences July 9–11, 2021
DOI 10.46254/AP01.20210100
ISBN 978-1-7923-6126-5
ISSN/E-ISSN 2169-8767