Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Mechanical and Electrical Works of Coal-Fired Steam Power Plant Construction Project in Indonesia to Improve Time Performance

75 views 6 Downloads
AP
Adnin Fairuzy Putri Universitas Indonesia
Download PDF

Published in 1st Asia Pacific International Conference on Industrial Engineering and Operations Management, Harbin, China
Publisher IEOM Society International
Date of Conferences July 9–11, 2021
DOI 10.46254/AP01.20210099
ISBN 978-1-7923-6126-5
ISSN/E-ISSN 2169-8767