Manufacturing

Two-stage Meta-Heuristic Algorithm for Parallel Machine Scheduling with Additional Resource Input in Shipyard Manufacturing

74 views 3 Downloads
CE
Chinedu Egbuonu Concordia University
AA
Anjali Awasthi Concordia University, Montreal
Download PDF

Published in 4th North American International Conference on Industrial Engineering and Operations Management, Toronto, Canada
Publisher IEOM Society International
Date of Conferences October 25–27, 2019
ISBN 978-1-5323-5950-7
ISSN/E-ISSN 2169-8767