Lean

Cycle Time Reduction in the Plastic Fuel Tanks Production Line: A Lean Manufacturing Case Study at Kautex Corporation

50 views 7 Downloads
FS
Faranak Sadeghitabar University of Windsor
SA
Sardar Asif Khan University of Windsor
HE
Hasti Eiliat
Download PDF

Published in 4th North American International Conference on Industrial Engineering and Operations Management, Toronto, Canada
Publisher IEOM Society International
Date of Conferences October 25–27, 2019
ISBN 978-1-5323-5950-7
ISSN/E-ISSN 2169-8767