Flowshop Scheduling Problem (FSP) is a common but not trivial problem in manufacturing scheduling. Lower bound (LB) measures can provide a reasonable estimation considering makespan minimization. This paper deals with an analysis of a LB measure comparing with the CDS heuristic and the optimal solution of FSP. Performed simulations varying the number of jobs (N) and machines (M) with processing times following uniform and exponential distributions show that the discrepancies between the solutions tend to increase until N
Track: Mathematical Modeling/ Heuristics and Meta-heuristics
Published in: 4th North American International Conference on Industrial Engineering and Operations Management, Toronto, Canada
Publisher: IEOM Society International
Date of Conference: October 25
-27
, 2019
ISBN: 978-1-5323-5950-7
ISSN/E-ISSN: 2169-8767