Optimization of Review Periods and (s, S) Levels of Floor Stock Items in a Paint Production Environment

82 views 4 Downloads
BE
Banu Ekren Yasar University, Dept. of Industrial Engineering, Izmir, Turkey
Download PDF

Published in 5th North American International Conference on Industrial Engineering and Operations Management, Detroit, USA
Publisher IEOM Society International
Date of Conferences August 9–11, 2020
ISBN 978-0-9855497-8-7
ISSN/E-ISSN 2169-8767