Development of Quality Management System in the Process Planning Repair Risk-Based in Government Building
Riany Aldesty and Yusuf Latief
Construction Management from Department of Civil Engineering
University of Indonesia
riany.aldesty@yahoo.com
yusuflatief73@gmail.com
Abstract
Government buildings require repair to extend the life of the building so that services to the community can be indirectly met. The budget is issued annually by the government to maintain the building, but in carrying out repair there is no Quality Management System which is the basis repair of government buildings. This study aims to develop a Quality Management System Risk-Based in the planning process on repair in Government Building. Research method used in this research is Delphi method and respondent survey. The most dominant risk variables selected using questioner and analyzed SPSS. The results of the study is Standard Operation Procedures can improve the quality and performance of building function in the management of repair planning in buildings with renewable methods
Keywords
Repair, risk management, government building, quality management, standard operation procedures
Biographies
Riany Aldesty earned her Bachelor’s degree from Department of Civil Engineering, Andalas University Padang in 2014. Currently she is a student of Construction Management from Department of Civil Engineering, University of Indonesia.
email : riany.aldesty@yahoo.com / riany.aldesty@gmail.com
phone : +62 81374094191
Yusuf Latief is a Professor of Construction Management from Civil Engineering Department, University of Indonesia. He actively writes articles in national and international journals with specifications in the areas of Project Managemen and Construction.
email : yusuflatief73@gmail.com
phone : +62 816996936