8th Annual International Conference on Industrial Engineering and Operations Management

Effective Heuristics for the Bicriteria Scheduling Problem of Minimizing Total Tardiness and Total Flow Time with Zero Release Dates

SAHEED AKANDE
Publisher: IEOM Society International
3 Views
4 Downloads
Track: Operations Research

Published in: 8th Annual International Conference on Industrial Engineering and Operations Management, Bandung, Indonesia

Publisher: IEOM Society International
Date of Conference: March 6 -8 , 2018

ISBN: 978-1-5323-5944-6
ISSN/E-ISSN: 2169-8767