Implementation of Overall Equipment Effectiveness (OEE) to Minimze Six Big Losses in Machining Process: A Case Study

165 views 17 Downloads
PA
Pitoyo Amrih Sebelas Maret University
RD
Retno Wulan Damayanti Industrial Engineering, Engineering Faculty, Sebelas Maret University
Download PDF

Published in 3rd Australian Conference on Industrial Engineering and Operations Management, Sydney, Australia
Publisher IEOM Society International
Date of Conferences September 24–26, 2024
DOI 10.46254/AU03.20240065
ISBN 979-8-3507-1738-9
ISSN/E-ISSN 2169-8767