Washington River Protection Solutions
Project Manger for the Closure and Interim Measures Group, leading the technical and regulatory closure of waste management area (WMA) 241-C Tank Farm. Also supporting tank & vault waste retrieval strategy and design for catch tanks and vaults within C-farm. I joined WRPS in 2020 after 20+ years in the geophysical consulting industry where I gained extensive experience in the application and management of geophysics towards environmental remediation, geotechnical studies, and mineral exploration. My initial work at WRPS focused on leak detection for the U.S. Department of Energy (DOE) Hanford Nuclear Reservation’s waste storage tanks and environmental characterization to support environmental planning.