US NRC
He began his NRC career in 1990 in the Office of Nuclear Reactor Regulation. In 2004, he transferred to the Office of International Programs as the supervisor for export/import licensing. In 2014, he transferred into his current position as a Senior Project Manager in the Low-Level Waste Branch in the Office of Nuclear Material Safety and Safeguards. He’s assigned as the project manager for 10 CFR Part 61. He’s actively working on the 10 CFR Part 61 rulemaking and he’s here today to talk to us about the NRC’s very-low level waste scoping study.