Washington River Protection Solutions
Dan Parker is a project manager with Washington River Protection Solutions (WRPS) at the Hanford Site. Dan has a wide range of project management experience including the design, construction, and operation of groundwater and vadose zone treatment systems; the development of tank retrieval systems, and the development and calibration of borehole geophysical logging equipment. Dan’s current areas of focus are interim actions to address vadose zone contamination near Hanford’s Single Shell Tanks, and the closure of Hanford’s Waste Management Area C.