Track: Modeling and Simulation
Abstract
Questionnaire result on Schedule/Planning showed that the mosque council already have an awareness about
the importance of scheduling and planning in preventive maintenance. Not only aware of the importance but
the mosque council also have been implemented it. And then on Technique/Maintenance and Components/Parts
and Equipment showed us that the mosque council has great stock management of equipment/spare
components. And about Inspection showed us that the mosque council was already aware of the importance of
inspection in preventive maintenance. Downtime showed that the mosque facility maintenance would disturb
the mosque activities. Not only disturbing the mosque activity, but the mosque maintenance also cost much
time. A mosque will continue to be an asset only if it is operated and maintained properly. It requires
maintenance to maintain structural integrity as well as aesthetic appearance, even inside and outside This study
was conducted to determine the extent to which preventive maintenance was implemented in mosques. The
research object of this study is a mosque. The questionnaire will be used for data collection in this study. The
questionnaire will be used to determine the criteria and subcriteria which are suitable as the result of this study.
The number of respondents for this study is 30 (thirty). The selected respondents are mosque administrators.
The Likert scale (1-5) was used to see the opinions of the respondents on whether the proposed criteria and sub-
criteria were deemed suitable or not with this study
Keywords
Preventive Maintenance Mosque, Scheduling/Planning, Mosque