A Case Study on Integrating Lean, TPM, and RCM to Improve Equipment Availability in Peruvian Metalworking SMEs

258 views 8 Downloads
MA
MOHAMMED ALKAHTANI King Saud University
MA
Mustufa Haider Abidi Advanced Manufacturing Institute, King Saud University
BA
BANDAR ALJABRI King Saud University
Download PDF

Published in 6th African Industrial Engineering and Operations Management Conference, Rabat, Morocco
Publisher IEOM Society International
Date of Conferences April 8–10, 2025
DOI 10.46254/AF6.20250002
ISBN 979-8-3507-4446-0
ISSN/E-ISSN 2169-8767