Integrating Lean Manufacturing and TPM for Process Optimization in Bakery SMEs: A Case Study from Peru

72 views 18 Downloads
RV
Roger Alberto Vásquez-García Universidad de Lima
RS
Rubén Francisco Samanez-Coronel Universidad de Lima
Download PDF

Published in 7th IEOM Bangladesh International Conference on Industrial Engineering and Operations Management, Dhaka, Bangladesh
Publisher IEOM Society International
Date of Conferences December 21–23, 2024
DOI 10.46254/BA07.20240014
ISBN 979-8-3507-4443-9
ISSN/E-ISSN 2169-8767