9th Annual International Conference on Industrial Engineering and Operations Management

100% REDUCTION OF OGP INSPECTION WAITING TIME AT XYZ ELECTRONICS CORPORATION USING MONTE CARLO SIMULATION, HEIJUNKA DEVICE AND MILITARY 105E SAMPLING STANDARD

Mary Rose Arnejo
Publisher: IEOM Society International
3 Views
4 Downloads
Track: Lean Six Sigma

Published in: 9th Annual International Conference on Industrial Engineering and Operations Management, Bangkok, Thailand

Publisher: IEOM Society International
Date of Conference: March 5 -7 , 2019

ISBN: 978-1-5323-5948-4
ISSN/E-ISSN: 2169-8767