9th Annual International Conference on Industrial Engineering and Operations Management

Design Optimization of Equipment Controls Setup and Workstation Tables for the Remote Production Taping of a Media Broadcasting Company

Arriane Palisoc, Gerald Semifrania, Yoshiki Kurata & Maricar Navarro
Publisher: IEOM Society International
0 Paper Citations
1 Views
1 Downloads
Track: Product Design and Development
Abstract

In the Philippines, media broadcasting provides quality television production shows which includes game shows, variety shows, talk shows, television journalism, musicals, soap operas, and many others which utilizes different setting up techniques and methodologies on preparing the entirety of the production set. In this production setup, lights, audio, and broadcast team comprises the three major production teams. All production setups differ from one another because of different requirements for every production shows, resulting to unstandardized setup times. This study aims to optimize the remote production setup of a media broadcasting company in accordance to engineering standards and with consideration of trade-offs that is based on applicable constraints such as Material VA/VE, Product VA/VE, Process VA/VE, Ergonomics, Economic, and Productivity. There are two design options and Based on the over-all rankings of constraints, the second alternative design or the “Workstation with Flip-Up Monitor Rack”. yielded a rank of 5 for Material VA/VE, 3.37 for Product VA/VE, 1.5323 for Process VA/VE, 4 for Ergonomics, 3 for Economic, and a governing rank of 5 for the Productivity constraint with an average overall rank of 3.65

Published in: 9th Annual International Conference on Industrial Engineering and Operations Management, Bangkok, Thailand

Publisher: IEOM Society International
Date of Conference: March 5-7, 2019

ISBN: 978-1-5323-5948-4
ISSN/E-ISSN: 2169-8767