Track: Systems Dynamics
Abstract
In recent centuries, the rate of water consumption has more than doubled and the Industrial population growth rate has continued to increase. As a result, water scarcity has now become one of the main problems that must be faced locally in Indonesia. In particular, Bekasi Regency is the largest industrial city in Indonesia and the largest in Southeast Asia with 11 industrial areas with 7,000 factories that have a very large need for water for industry.
Given such a dilemma, this study aims to develop a dynamic system model to evaluate a water management system in one of the Integrated Industrial City in Bekasi Regency. The focus is on the following two issues: (1) Policies that can be taken to reduce water demand of Integrated Industrial city in Bekasi area; (2) Model simulation the Impact of wastewater recycle to water demand and water supply of Integrated Industrial City Bekasi Regency.
One of the long-term steps and policies to prevent a water crisis that needs to be considered is how to use wastewater from factories or tenants in the industrial area to be recycled into raw water again, so that it can help meet the raw water supply needs for the industrial area. With a dynamic system simulation, it can be proven whether the water management is sensitive to the reuse/recycle of wastewater is important in this study. Simulating a water demand and supply based on Industrial area growing rate Integrated Industrial City in Bekasi Regency also important in this study.