Study of Factors Causing Delay of Toll Road Construction Project (Case Study: Project X)

67 views 5 Downloads
BU
BINUS University BINUS University
AM
Arief Satria Maulana BINUS University
OS
Oki Setyandito BINUS University
PA
Putri Arumsari BINUS University
Download PDF

Published in 2nd Indian International Conference on Industrial Engineering and Operations Management, Warangal, India
Publisher IEOM Society International
Date of Conferences August 16–18, 2022
DOI 10.46254/IN02.20220515
ISBN 978-1-7923-9160-6
ISSN/E-ISSN 2169-8767