Analysis of Schedule Overrun Methods in Acceleration of Scheduling in the Ploso Bridge Construction Project

BINUS University, Yosef Dedy Pradipto, Putri Arumsari & Jose Leonardo Lie
Publisher: IEOM Society International
0 Paper Citations
1 Views
1 Downloads
Abstract

Covid-19, one of the natural disasters that causes delays in construction projects.  The temporary lockdown policy, which was imposed at the beginning of the Covid-19 pandemic in Indonesia, causes delays in construction project. One of the project experiencing delays is the construction of the Ploso Bridge. Scheduling methods were needed to speed up the construction works. Fast tracking and crashing methods were used in this research to accelerate the preparation and soil work in the critical path of the Ploso Bridge. The result of the research is that by using the fast tracking method the duration is accelerated by 18 days compared to the normal duration. Whereas using the crashing method by adding one and two overtime hours, this reduces the duration of the project by 13 and 23 days respectively. Therefore, the crashing method by adding two overtime hours seem to be the most effective method to accelerate the duration of the project.

Keywords

Construction project, covid-19, crashing, delay, fast track

Published in: 2nd Indian International Conference on Industrial Engineering and Operations Management, Warangal, India

Publisher: IEOM Society International
Date of Conference: August 16-18, 2022

ISBN: 978-1-7923-9160-6
ISSN/E-ISSN: 2169-8767