Track: Construction Management
Abstract
The purpose of this research is to evaluate the productivity and cost of heavy equipment on embankment work in 27 km toll road development project in DKI Jakarta–West Java area and the cause of the different value of productivity from the planning. This research was conducted with quantitative method and analysed by comparing the calculation of productivity and costs based on survey result and theoretical data in an undisturbed and disturb conditions. This resulted that the productivity and cost of heavy equipment based on theoretical data in an undisturbed condition had better productivity and lower costs than productivity and costs based on survey in an undisturbed and disturb conditions. The different productivity value was caused by the dump truck that did not follow applicable regulations in compaction process and the after-rain condition that creates water puddles on site hence affected the heavy equipment’s productivity.
Keywords
Productivity of heavy equipment, heavy equipment, cost of the productivity, productivity of embankment work, construction management.