5th Annual International Conference on Industrial Engineering and Operations Management

Jobshop Scheduling for Skill-Dependent Make-to-Order System

Nasr Al Hinai
Publisher: IEOM Society International
0 Paper Citations
1 Views
1 Downloads
Track: Production Planning and Management
Abstract

In today’s competitive environment many companies are shifting their production strategy from Make-to-Stock to Make-to-order (MTO) system. The reasons are to cater product as per the need of customer and to reduce inventory holding cost. In MTO system, production starts only when order arrives to the shop floor and gets confirmed. Production planning of such system includes scheduling of orders to the production periods and allocation of workers at different work centers.  Complexity in such environment arises when the time to produce products is skilled dependent and from the shop floor condition. Under such situation, efficient scheduling of orders and allocation of workers at different work center play a major role to improve system performance. This research developed a mathematical model for workers allocation problem in a job shop production environment with an objective of minimizing makespan.

Published in: 5th Annual International Conference on Industrial Engineering and Operations Management, Dubai, United Arab Emirates

Publisher: IEOM Society International
Date of Conference: March 3-5, 2015

ISBN: 978-0-9855497-2-5
ISSN/E-ISSN: 2169-8767